MIL-DTL-28950C(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
38 Set belt loops (see Figure 10 and 11).
(cont'd)
b. Position one end of the 3-1/2 inch
Bartack
28 per
A
A
long belt loop on the right front and
bartack
(Silk)
(silk)
bartack the loop to the front at the
(min)
top edge of the lower pocket flap.
Turn under the top end of the loop and
bartack the loop to the front 1/8 to
3/16 inch from the folded edge,
catching the turned under portion of
the loop in the stitching.
39 Interline fronts.
a. Properly position the left and
301
Hopper
right fronts on the respective coat
front interlinings and baste along the
top edge of the upper pocket flap on
the outside.
b. Tack the top edge of the upper
301
Hopper
pocket stay and the front end of the
upper and lower pocket stay to the
coat front interlining. The front end
of the stays shall be tacked as close
to the side edges of the pocket flap
as possible.
c. Baste the interlining and fronts
301
Hopper
together starting approximately 1-1/2
inches above the top edge of upper
pocket flap and baste along the center
of the upper pocket flap and pocket,
along the waist dart to the top edge
of the lower pocket flap, and then
diagonally across front corner of the
lower pocket flap to the front edge of
the lower pocket and from that point
continue to baste along the front edge
of the pocket to the bottom of the
coat.
d. Baste horizontally towards the
301
Hopper
front of the coat, starting from the
top of the center basting stitch.
Continue to baste along the front edge
to the bottom of coat.
42
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business