MIL-DTL-28950C(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
27 Bind center and side back.
Finished appearance. The binding
shall be uniformly stitched and shall
not be tight or full causing puckers,
gathers, or pleats; the basic material
and edges of binding shall be caught
in the stitching. The outside raw
edge only of the binding shall be
turned under and caught in the
stitching.
a. Bind the raw edge of the center
301
BSb-1
10-14
A
A
back with 3/4 to 7/8 inch wide bias
binding from the top edge of backs to
the top end of vent. The outside raw
edge only of the binding shall be
turned under and caught in the
stitching 1/16 inch from the inner
folded edge. When binding the left
center back, continue to bind the raw
edge of the vent for the left back
from the top to the bottom end. The
binding is not required along the top
vent.
b. Bind the raw side edges of the
301
BSb-1
10-14
A
A
left and right side-backs,
respectively, from the top to the
bottom edge of the coat with 3/4 to
7/8 inch wide bias binding. The
outside raw edge only of the binding
shall be turned under and caught in
the stitching 1/16 inch from the inner
folded edge.
28 Seam lining to right vent.
Finished appearance. The vent lining
shall be uniformly stitched and shall
finish smooth and flat without twists,
gathers, puckers or pleats.
a. Fold vent lining piece in half
301
SSa-1
10-14
A
A
lengthwise and stitch across the top
of the vent with 1/4 inch seam.
b. Turn the vent lining inside out,
forcing the corner out.
33
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business