MIL-DTL-28950C(MC)
Manufacturing requirements - Continued.
TABLE I.
SEAM/
STCH
STCH
BOB/
NO
OPERATION
TYPE
TYPE
STCH/IN
NDL
LPR
d. Stitch and backstitch across the
301
SSa-1
12-16
A
A
top end of the vent on the outside
(silk)
(silk)
through all plies for a distance of
1-1/2 + 1/8 inches from the center
back seam. The stitching shall be
through the vent lining.
29 Join back.
(cont'd)
e. Join the left and right side backs
301
SSa-1
10-14
A
A
to the respective center backs with
3/8 inch seam.
30 Press side and center back seams and
vent lining.
a. Notch the top end of the right
vent diagonally from the juncture
point of the vent and the center seam
allowance of the right center back to
lower end of the stitching for the
center back seam.
b. Spread the side and center back
seam open, respectively, and press
flat with a heated pressing iron.
31 Fell vent lining.
Finished appearance. The folded edge
of the lining shall be accurately
aligned with the center seam allowance
of the right back part. The felling
shall not be visible on the outside of
the coat.
a. Baste top edge of vent lining to
Hand
coat.
or
101
or
Hopper
301
b. Fell vent lining to coat across
Hand
C
the tope edge and on both side for a
(silk)
distance of not less than 1 inch from
the top end.
32 Seam reinforcement stay to armhole and
shoulder.
Finished appearance. The polyester
twill reinforcement stays shall be
sewn to the armhole and shoulder edges
of the front without gathers, puckers
or pleats.
35
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business