MIL-DTL-43415D
TABLE III. Manufacturing requirements - continued
Seam &
Stitches
Thread
Stitch
Stitching
per
Bobbin/
No.
Operation
Type
Type
Inch
Needle Looper
8. Make front stay.
a. Position the reinforcement on the cotton
cover as indicated by notches on pattern.
b. Fold sides of cotton cover over
301
----
8-10
A
A
reinforcement toward center and stitch through
all plies with two rows of vertical stitching 1-
1/4 to 1-5/16 inches gage, and centered on
stay.
c. Stitch across top of stay 5/8 to 3/4 inch
301
----
8-10
A
A
from top edge of stay, catching edge of plastic
reinforcement in the stitching.
d. Insert the twin wire tape, cut 3-3/8 to
3-1/2 inches long, between rows of stitching,
positioned between plastic and cover.
9.
Make band.
Join back seam of band and press seam
301
SSa-1
8-10
A
A
open.
10.
Join band to sides and sides to crown.
a. Position band on sides with back seams
101 or
SSa-1
8-10
A
A
aligned and stitch band to sides.
301
A
b. Position crown to sides as indicated by
301
SSa-2
8-10
A
A
marks on pattern and stitch crown to sides
catching the top of front stay in the stitching at
center front of cap. Place a second row of
stitching, centered between the first row of
stitching and the raw edge.
142p16" style="font-size:12px">16
Downloaded: 2014-09-28T11:48Z
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business