MIL-DTL-28936B(MC)
b.
Pressure between pressing surfaces of 6 pounds force
per square inch (lbf/in2) minimum and 7 1bf/in2 maximum.
c.
Pressing time of 12 seconds minimum and 14 seconds
maximum.
d.
Heat-dry.
6.6. Peel strength test. The procedure for the peel strength
testing with a spring scale should be obtained from the supplier
of the fusible material, and be accomplished two hours after
fusing.
6.7. Hardware. Custom Crafters, Inc. (815 North Mountain Road,
Newington, CT 06111) style No's Z-301 buckle and Z-200 slide have
been found to meet the requirements of 3.3.10.
6.8. Subject term (keyword) listing.
Evening dress
Waist-coat
6.9. Changes from previous issue. Marginal notations are not
used in this revision to identify changes with respect to the
previous issue due to the extent of the changes.
Preparing Activity:
Navy - MC
Project No. 8405-N307
25
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business